Process Validation & PPQ
Process Performance Qualification After Technology Transfer
PPQ should confirm what you already know, not discover it.
Process performance qualification (PPQ) is where the receiving site shows, at commercial scale, that it can make the product every time. We check whether you're ready, justify the number of batches, and write the protocol, the report and the monitoring plan that follows.
- Clients served
- 800+
- Countries
- 64
Where validation goes wrong after a transfer
PPQ starts before the site is ready
A press with open qualification actions, or a method not yet validated at the new lab, turns a good batch into a deviation. The product may be fine. The evidence isn't.
Three batches, no reason given
Three is a habit more than a rule. FDA sets no number, and Annex 15 asks you to justify yours. "We always do three" is a weak answer when the process is new to the plant.
The old validation gets ignored
A transferred product comes with history: earlier validation, years of batch data, known weak spots. Annex 15 expects that knowledge to be used. It can make the new work smaller and better aimed.
How we run process performance qualification, from readiness to CPV
1. Read the history. We review the sending site's validation and batch data with the results of the transfer batches. That tells us which steps need attention and which have never moved.
2. Check readiness. Equipment and utilities qualified, methods validated for their use, critical suppliers qualified, operators trained, batch record final. We ask for the evidence and review the documents. IQ, OQ and PQ stay with the site, or its qualification contractor. We read those records against the ranges this process needs, because a mixer can be qualified and still not cover your speed.
3. Justify the batches. The number follows from process knowledge and risk. For several strengths, Annex 15 lets a transferred product use bracketing if existing knowledge supports it. We write down why.
4. Design the sampling. Samples go where variation is likely: start and end of compression, hopper changeover, dryer corners, the first and last vials filled. Sample size has a statistical reason behind it.
5. Write the protocol and support the batches. Parameters, limits and acceptance criteria are approved before the first batch. We support the runs on site or remotely.
6. Report, then keep watching. The report says whether the process is validated and under which conditions. The continued process verification plan then sets what to trend and when a trend needs action.
What we assess
- Readiness Review
- Stage 2 PPQ
- Sampling Plan Design
- Qualification Records
- Stage 3 CPV
What you receive
- Readiness review what must close before PPQ, with an owner for each item.
- Qualification record review the site's IQ/OQ/PQ documents read against the process ranges.
- Batch and sampling rationale the numbers and why they are enough.
- PPQ protocol critical parameters, quality attributes, sampling and acceptance criteria.
- Process validation report results, deviations and a clear conclusion.
- CPV plan attributes to trend, frequency and action limits.
US and EU expectations are close, not identical
FDA describes three stages: process design, process qualification and continued process verification. EU guidance speaks of traditional, continuous and hybrid approaches. One protocol can serve both if it is planned that way.
- FDA Process Validation guidance (2011) the three-stage lifecycle. PPQ is part of stage 2.
- EU GMP Annex 15 (2015) section 5 covers site transfers, bracketing and batch numbers.
- EMA process validation guideline the validation data a dossier needs.
- WHO TRS 1019, Annex 3 used for WHO prequalification and many other markets.
- WHO TRS 1044, Annex 4 (2022) qualification and validation within a transfer.
Who it's for
- Plants validating a transferred product
- CMOs validating client products
- Licensees starting commercial production
- Companies with an inspection finding on validation
When plants ask for PPQ support
Transfer batches have passed and the site needs a protocol its QA team and the client will both sign. Or a CMO has to validate a product it knows only from a batch record.
Some requests come later. An inspector asks for the rationale behind three old batches, or an older product needs a monitoring program it never had. For aseptic products, media fills and filter validation sit beside PPQ and have to be planned with it.
Why the transfer team should write the protocol
Validation protocols written from a template test everything equally. If we ran your transfer, we already know which step needs thirty samples and which needs three.
The results go straight into the technology transfer report. If commercial batches start to drift later, our troubleshooting work starts from the same data.
Part of the Indivirtus group
- Group companies
- 6
- Clients across the group
- 800+
- Countries
- 64
Frequently Asked Questions
What is process performance qualification? +
It is the part of process validation where the commercial process runs on qualified equipment, with trained operators and the final batch record, and is sampled more heavily than usual. In FDA terms it belongs to stage 2. A successful PPQ shows that the process performs as expected at that site, and it comes before commercial distribution.
Is PPQ the same as process validation? +
No. Process validation covers the whole lifecycle: designing the process, qualifying it and then verifying it during routine production. PPQ is one step in the middle. People often say "validation batches" when they mean PPQ batches, which hides the fact that the evidence has to continue after those batches are released.
How many PPQ batches are required? +
FDA guidance gives no fixed number. Annex 15 says a minimum of three consecutive batches is generally considered acceptable, but it still expects you to justify the number and allows another if you can support it. After a transfer, the previous validation and the transfer batch results both feed into that justification.
What must be ready before PPQ batches? +
Qualified equipment and utilities, validated test methods, qualified suppliers for critical materials, trained operators, a final master batch record and an approved protocol. Cleaning also needs an agreed approach. We review the documents for each item and list what's open. Starting with a known gap usually creates more work than waiting for it to close.
Can PPQ batches be sold? +
Often, yes, if that was decided in advance. Annex 15 says the intention to release should be predefined, and the batches must fully comply with GMP, the validation acceptance criteria and the marketing authorization. The decision stays with your quality unit, or the Qualified Person in the EU. Release before the new site is approved is a separate regulatory question.
Does a site transfer always need new process validation? +
Expect some. Annex 15 includes site transfers in its process validation section, and EU guidance wants validation to cover each manufacturing site. What can change is the size of the job. Bracketing across strengths or pack sizes may reduce the number of batches when product knowledge and the earlier validation support it.
Show all 7 questions
What is continued process verification? +
It's stage 3 of the FDA lifecycle: routine batch data are collected and trended to show the process stays in control. The EU equivalent is ongoing process verification, run under a protocol and reported. Early commercial batches after a transfer are usually sampled more closely, until there's enough data to judge normal variation.